Pegasus Energieberatung / Accessibility
Accessibility at Pegasus Energieberatung
Accessibility features
The website uses semantic headings, labelled form fields, visible keyboard focus and a skip link to the main content. Content adapts to narrow screens. Reduced-motion preferences are respected.
Checklists and contact
All checklists are fully readable as HTML. PDFs with selectable text and structure tags are also available. Without JavaScript, email and phone links remain usable for contact.
Our standard
We align this website with WCAG 2.2 Level AA. We have checked every page in German and English with the axe-core testing tool.
Report a barrier
Please identify the affected page and describe the difficulty. kontakt@pegasus-beratung.de · +49 40 645 335 90
This accessibility statement was last updated on 16 October 2026.
