Before you decide: questions our guides answer
The guides help you organise a project before you request quotations or sign contracts. Six in-depth articles take you through a topic in six steps each: preparing a solar roof, assessing a heat pump in an existing building, planning solar PV, a heat pump and battery storage together, choosing a suitable renovation sequence, preparing an energy renovation for an apartment owners’ association, and reading thermal images correctly. Shorter guides cover common renovation mistakes, how to choose an energy adviser and practical first steps to save energy at home. Two checklists help you gather the documents for a BAFA application and for a renovation roadmap.
The articles are meant as decision support, not as an assessment of your building. They explain what matters for a given question, which documents help and where general statements reach their limits. They deliberately contain no blanket savings promises, prices or assurances of funding, because these depend on the individual building. We list the sources used at the end of each article. Most come from public authorities, municipalities, funding bodies, research institutions and consumer organisations; a few come from manufacturers, municipal utilities and specialist firms. The six in-depth guides also state when they were last checked.
Funding conditions and legal requirements change. Since 1 April 2025, for example, the BAFA grant for energy advice has been paid to the applicant, because the former payment authorisation was discontinued. Following the 2026 reform, the former Building Energy Act (GEG) is called the Gebäudemodernisierungsgesetz (GModG); its main new provisions have applied since 29 July 2026. Since 21 July 2026 the iSFP bonus has only been granted above a minimum eligible investment volume (position as of 28 August 2026). What applies are the funding conditions of BAFA and KfW at the time of your application and the law in force, so always check funding amounts with these bodies.
- BAFA information sheet on the proof of use declaration (Merkblatt zur Verwendungsnachweiserklärung, German, as of 01.04.2025)
- BMWE FAQ A.3.2: change to the iSFP bonus from 21.07.2026 (German)
- Gesetze im Internet: Gebäudemodernisierungsgesetz (GModG, German)
- Federal Government: new Gebäudemodernisierungsgesetz (German, 29.07.2026)
Which article suits you first depends on your starting point. If you want to find out whether your roof is suitable for solar PV, the article on preparing a solar roof is the obvious place to begin. If your heating system is due for replacement and a heat pump is an option, start with the guide on heat pumps in existing buildings. If you are planning solar PV, a heat pump and battery storage together, the combined guide explains how to compare options on the same assumptions, including one without a battery. Anyone planning several measures one after another will find criteria for the order in the renovation sequence guide. Owners’ associations learn how to structure the preparation of a resolution, and if you notice cold wall surfaces or draughts, the thermography article explains what a thermal image can and cannot show. If you are unsure which guide fits your project, describe your building in an enquiry.
