Pegasus Energieberatung
Home

Renovation roadmap Turn possibilities into a plan.

Planning improvements but unsure where to start? An individual renovation roadmap (individueller Sanierungsfahrplan, iSFP) assesses your home and organises suitable measures into a sensible sequence.

Enquire about renovation roadmap
Is this right for me?

For your building.
For your decision.

For single- and two-family homes, apartment buildings, homeowners’ associations (WEG) and property managers. Particularly useful when improvements will be phased over several years. The roadmap helps you turn possibilities into a plan by assessing measures and putting them in a sensible order.

Clearly agreed. Clearly defined.

An iSFP is a decision-making guide. It does not oblige you to carry out work or guarantee actual savings or future grants. Detailed design, subsequent funding applications and construction support require separate agreements.

What determines the cost?

Building size, dwelling count, available documents and complexity determine the fee. Your written quotation sets out the work, required input and intended timeframe.

Funding needs context

The right programme.
The right sequence.

Measures from a renovation roadmap fall under different programmes. Current conditions and your specific project determine what applies.

No promise of funding. Whether a measure from your roadmap is eligible, what amount applies and who submits the application must be checked for your individual project before commissioning. The same applies to deadlines.

03 / How we work together

From the first idea
to the next step.

01

Understand your plans

Tell us about your building, your goals and your current planning stage.

02

Agree the scope & quotation

Receive a written quotation covering the work, fee and process.

03

Take a closer look on site

As commissioned, we assess your building, calculate or measure.

04

Decide on the next steps

We discuss the findings and any agreed support with implementation.

Your home has potential

Let’s make the most of it.

Tell us about your building. Together, we’ll identify the next sensible step.

Enquire about your project
Good to know

Still have questions?

What is an individual renovation roadmap (iSFP), and how can it help me?

An iSFP turns an energy assessment into a practical renovation plan for your home. It places suitable improvements in an overall building concept and can support either staged refurbishment or a comprehensive renovation.

Direct link to this answer

Can an iSFP help me renovate in stages?

Yes. The roadmap can organise individual improvements into a coordinated sequence. Later work is considered from the start, helping you plan insulation, windows and heating together.

Direct link to this answer

What qualification should my adviser have for a funded iSFP?

For funding under the residential energy-advice programme, the adviser must be listed in the federal energy-efficiency expert directory in the residential energy-advice category. Check the relevant listing before appointing an adviser.

Direct link to this answer

What is an on-site energy consultation?

In an on-site energy consultation, an energy adviser visits your home, records its energy condition and derives renovation recommendations from it. The state-subsidised form is now called ‘Energy Advice for Residential Buildings’ (Energieberatung für Wohngebäude, EBW), and its result is an individual renovation roadmap (iSFP).

‘Vor-Ort-Beratung’ is the former name of the funding programme, most recently in the title of the 2020 guideline. A visit to the building is still mandatory under the current guideline. The recommendations are a basis for decisions, not a guarantee of savings. You decide whether and when to carry out any measures.

Funding for energy advice

Direct link to this answer

How is a renovation roadmap prepared?

A renovation roadmap is prepared in several stages: after an initial conversation, the energy adviser records your building on site, calculates its current energy performance and develops renovation proposals from this.

You and the adviser agree on these proposals before the final iSFP is drawn up. It consists of two documents: ‘Mein Sanierungsfahrplan’ sets out the measures and their sequence clearly, and ‘Umsetzungshilfe für meine Maßnahmen’ explains them in more detail. The calculations are made in energy-balance software, and the documents are produced with a standard iSFP print application. Finally, the results are handed over and explained to you.

How long preparation takes

Direct link to this answer

How much does an individual renovation roadmap (iSFP) cost?

An individual renovation roadmap (iSFP) has no standard price: the fee varies by building and usually depends on the calculation work and the documents available. For buildings with a simple shape, the work involved is usually less than for buildings with many bay windows or sections from different periods.

Through the federal funding for residential energy advice, BAFA subsidises part of the fee, up to a cap that depends on the building type. Conditions include an adviser on the federal energy-efficiency expert list and an application made before an unconditional advice contract is signed. You pay the full fee up front; the grant is then paid to you. As the funding guideline is time-limited, ask for services, fee and current funding to be itemised in the quotation.

Floor plans, known construction details and earlier improvements affect how much additional information must be collected. Subsidised advice always includes on-site data collection and the handover and explanation of the roadmap and its implementation guide; clarify whether discussion of alternatives and any additional investigations are included. Potential support does not remove the need to check the gross fee and your own contribution; programmes and eligibility are assessed separately.

More about funding advice

Direct link to this answer

When is a renovation roadmap useful?

An iSFP is particularly useful when several improvements are being considered and their order, interaction and costs need to be assessed together.

It connects an assessment of the current building with a coordinated route for improvement, for example when the roof, windows and heating may be replaced at different times. Its value depends on whether the alternatives match your objectives and are explained clearly. A narrowly defined decision may need a different scope of advice. An iSFP does not require you to carry out the measures, and does not replace detailed design or qualified installation.

Direct link to this answer

Do I have to implement every measure?

No. You decide whether, when and how much to renovate. The roadmap helps you consider technical dependencies.

Direct link to this answer

What if building documents are missing?

This does not automatically prevent advice. We discuss which information can be obtained, recorded on site or documented as an assumption.

Direct link to this answer

Are later funding applications included?

Not automatically. The iSFP concludes with the agreed documents and final discussion. Further funding procedures need a separate commission.

Direct link to this answer