Pegasus Energieberatung
Home
Understand buildings. Prepare decisions.

Solar PV advice for your home

What solar PV advice covers: roof condition, electricity demand, options and coordination. Advice without an installation offer.

Discuss your project

What does the consultation establish?

Photovoltaics converts sunlight into electricity. Solar PV advice here covers planned electricity generation on or integrated into the roof. Advice connects roof suitability, electricity use and planned building work before deciding on system size, storage or an installation quotation.

  • Organise open questions about roof condition, shading and usable space
  • Coordinate solar panels with roof and insulation work
  • Compare options with and without a battery against your consumption
  • Document assumptions and further specialist checks
  • Clarify responsibilities for roofing, electrical design and grid connection

Documents that help you prepare

  • Roof plans, photographs and known repairs
  • Electricity consumption and use throughout the day
  • Available meter-cabinet and grid-connection information
  • Plans for a heat pump, charging point or roof renovation
  • Existing quotations with a clearly defined scope

We record missing information as open points. You need not have every document first.

Which costs need to be considered separately?

Roof complexity, available records, the number of options and the depth of quotation comparison determine the advisory work. Equipment prices and consultancy fees are separate items. No fixed price is quoted here.

Distinguishing advice and implementation

Advice does not replace structural assessment, detailed electrical design, grid-connection approval or required permissions. Pegasus does not offer installation here. Generation, self-consumption and financial outcomes depend on actual assumptions and subsequent implementation.

Related guides

Locations focusing on solar PV advice

Your home has potential

Let’s make the most of it.

Tell us about your building. Together, we’ll identify the next sensible step.

Enquire about your project
Good to know

Still have questions?

Is support available for photovoltaics in Schleswig-Holstein?

Depending on the system, national financing programmes and local offers may be relevant. Schleswig-Holstein states that its former ‘Klimaschutz für Bürgerinnen und Bürger’ programme will not continue.

Older references to battery or balcony-solar grants are therefore not a basis for a new financing decision. Assess a roof array, battery and plug-in solar unit as distinct potential funding items. IB.SH provides a regional contact for current opportunities; KfW 270 is one national financing route for eligible PV projects. Check eligibility, application timing and lending terms for the property before a binding decision. Being located in Schleswig-Holstein does not itself establish entitlement to support.

Direct link to this answer

Which costs belong in a home solar PV budget?

The investment includes more than panels: an inverter, installation, electrical integration and possibly roof work or storage. A dependable total price requires a defined scope.

Ask for the included work and exclusions to be explained separately. Access equipment, the meter cabinet, cable routes, connection coordination and documentation deserve attention. Price a storage option separately so its additional cost stays visible. Eligible costs listed by a financing programme are not a general market price list. Roof records, electricity use and existing quotations help prepare advice. They do not establish an installation price without assessment; advice fees and construction costs are separate items.

Direct link to this answer

What PV support may be available in Mecklenburg-Vorpommern?

Suitable rooftop systems may qualify for KfW loan 270. The state mini-solar scheme concerns plug-in systems. As of 10 September 2026, LFI reported funds remaining for tenants, while the owner allocation was exhausted.

Assess rooftop arrays and plug-in units separately. KfW 270 is a loan; private applicants must export some of the generated electricity. Applications go through a financing partner before the project starts. In contrast, LFI requires applications to its mini-solar programme after purchase and installation. Do not transfer that sequence to other schemes. Check current eligibility, funds and conditions before making a financial commitment. This does not confirm a municipal grant for a particular roof in Schwerin or Wismar.

Direct link to this answer

Can an east- or west-facing roof work for solar panels?

Yes, east- and west-facing roofs can be suitable. Shading, roof condition, usable area and your daily electricity-use pattern all matter. Generation is distributed differently through the day than on a solely south-facing roof.

Direct link to this answer

Does a home solar system need a battery?

A grid-connected solar system can operate without a battery. Storage shifts solar electricity to other times of day. Whether the extra investment is worthwhile depends on your consumption pattern, suitable sizing, cost and losses.

Direct link to this answer

What should I compare before accepting a solar installation quote?

Compare the scope, proposed components and extra work such as scaffolding or meter-cabinet changes, as well as the total price. Storage and expansion options should be clearly described. The proposal needs to fit your property.

Direct link to this answer