1. Define what the solar roof should achieve
Photovoltaics, or PV, produces electricity; solar thermal collectors produce heat. First write down what the electricity should serve: today’s household, a future heat pump, an electric vehicle or several apartments. Also record whether roof renewal is already planned. This establishes a shared brief for roofing and energy equipment. Avoid selecting a package before that brief exists. An enquiry becomes more useful when it describes objectives, unresolved questions and the alternatives you want compared. Where several people own the building, include who can make decisions about the roof and who should receive the assessment.
2. Assemble roof information and condition records
Gather available roof drawings, construction dates, information about the covering, previous repair invoices and photographs taken from safely accessible positions. Record known leaks, roof windows, chimneys and planned alterations. Ask what information is missing for the structural assessment and which specialist should assess the roof condition. An appealing electricity yield is less useful if a near-term roof repair requires the array to be removed. Request a coordinated sequence for roof repairs, any insulation work and installation. You do not need to climb onto the roof to prepare an enquiry: missing dimensions can be collected during an appropriate professional visit.
3. Check potential against the actual site
Consider orientation, slope, shading and continuous areas of roof. A map assessment is an initial indication, rather than an installation layout. Lübeck explicitly explains limitations of its solar potential map; protected buildings and conservation areas also require checks with the responsible authority. Do not assume that permission or suitability at another address applies to your property. Request a sketch identifying obstacles and areas that remain uncertain. A useful decision record distinguishes information taken from the map model from observations already verified at the building, and assigns a next step to each unresolved site constraint.
4. Compare demand and system alternatives
Collect electricity bills and, where available, consumption records with timestamps. Add planned changes and their likely dates. A heat pump arriving several years later should not silently be treated as an existing load in today’s comparison. Ask for at least one option without a battery and one justified storage option. HTW Berlin provides tools for exploring these combinations, subject to assumptions that need checking against your household. Record generation, direct use, export and grid purchases separately. A high self-consumption percentage alone does not establish which investment is suitable; the comparison should also show additional cost and the uncertainty in expected use.
5. Make quotes and connection responsibilities explicit
Compare quotes against the same scope. Ask about access equipment, roof work, cable routes, the inverter, meter cabinet, design, documentation and explicitly excluded items. Record who will coordinate with the network operator and who will register the system in the German market master data register, the Marktstammdatenregister. The Federal Network Agency describes these as distinct tasks; an installer’s involvement should be agreed specifically. Advice or an estimated yield does not complete them. Clarify possible additional costs and distinguish assumptions from contracted deliverables. Any funding assessment should identify the actual programme and the date on which its requirements were checked.
6. Move forward with a clear decision record
Summarise roof findings, outstanding checks, the preferred alternative and cost items on one page. Add the consumption information used and name a contact for each open point. A useful enquiry states the location, building type, ownership arrangement, status of roof planning and the advice you need. If you already have quotes, their differences can then be discussed precisely. Include handover in the brief: which records will you receive, who will explain operation and where will generation or faults be visible? Pegasus addresses preparation and advice here. Installation, electrical connection and commissioning are separate responsibilities of the companies carrying out the work.
Sources and technical background