Pegasus Energieberatung
Home

Thermography Look closer. Understand more.

Cold interior surfaces, draughts or questions about insulation? Building thermography shows surface temperatures and helps put thermal anomalies into context.

Enquire about thermography
Is this right for me?

For your building.
For your decision.

For residential buildings before renovation or for agreed quality checks. The heating season often offers suitable temperature differences; sun, wind and rain affect the reliability of results. With professional interpretation, thermal images help you understand more about the surface-temperature patterns of your building, within the limits of what such measurements can show.

Clearly agreed. Clearly defined.

Thermal images do not see through walls. Alone, they cannot prove moisture or the cause of mould, and do not replace an airtightness test. Additional measurements require a separate agreement.

What determines the cost?

Building size, access, interior and exterior imaging, and the depth of interpretation and reporting determine the quotation. Scheduling depends on suitable measurement conditions.

03 / How we work together

From the first idea
to the next step.

01

Understand your plans

Tell us about your building, your goals and your current planning stage.

02

Agree the scope & quotation

Receive a written quotation covering the work, fee and process.

03

Take a closer look on site

As commissioned, we assess your building, calculate or measure.

04

Decide on the next steps

We discuss the findings and any agreed support with implementation.

Your home has potential

Let’s make the most of it.

Tell us about your building. Together, we’ll identify the next sensible step.

Enquire about your project
Good to know

Still have questions?

Can a thermal camera see through walls?

No. A thermal camera detects radiation from the visible surface. Unusual patterns can suggest insulation problems or other issues, but they do not by themselves prove what is happening inside the wall.

Direct link to this answer

Why do weather and survey timing matter for building thermography?

Sunlight can warm building surfaces even after exposure ends, while wind, rain and reflections affect the image. Survey conditions and temperatures must suit the investigation and be considered when interpreting the results.

Direct link to this answer

Should my home be surveyed with thermal imaging from inside or outside?

It depends on the issue being investigated. Exterior images examine the building envelope; interior images can focus on affected areas within rooms. Some investigations benefit from both. Agree on the scope beforehand.

Direct link to this answer

How much does building thermography cost?

A useful price assessment needs the investigation question and agreed scope. Exterior images, complementary indoor views and an explained report are different parts of a service.

Ask which sides and rooms are included, what conditions are needed, and whether interpretation and discussion follow the visit. Additional airtightness or moisture investigations should be specified explicitly. An image package is not directly comparable with a more detailed assessment. A useful quotation also explains what happens in unsuitable weather. State the location, building type and observed problem in your enquiry. The appropriate quotation establishes the Pegasus fee.

Direct link to this answer

Can thermography diagnose mould?

No. It can identify unusually cold surfaces. Moisture or mould diagnosis requires further investigation.

Direct link to this answer

Does thermography give me a complete renovation plan?

Not on its own. It answers a specific question. A separately commissioned iSFP can incorporate the findings into broader planning.

Direct link to this answer