1. Document the existing heating system
Prepare floor plans, heated floor areas, records of insulation improvements and several energy bills. Add photographs of the heating appliance, radiators and existing labels. Note rooms that remain uncomfortable and any changes in occupancy. Consumption records describe past operation under particular conditions; they are not a complete design calculation for a replacement system. Identify unusually low-use years or periods when the property was empty. Ask for unknown building details to be marked as assumptions. Quotes can then refer to the same starting conditions rather than silently modelling different versions of the house.
2. Assess heat demand and emitters together
Have the required heating capacity assessed professionally and allocated to rooms. This makes it possible to check which emitters can deliver enough heat at suitable operating temperatures and where targeted changes are needed. Fraunhofer field research shows that existing buildings with different emitter arrangements can be suitable; it does not guarantee suitability for every property. Ask for an explanation if a proposal replaces every radiator automatically. Record whether planned insulation is already included. Any changes to controls for an assessment should be coordinated with a qualified professional, and must preserve the requirements for domestic hot-water hygiene.
3. Resolve the heat source and location early
Check space for indoor and outdoor equipment, pipe routes and future servicing. For an air-source heat pump, sound assessment belongs to the actual site: neighbouring windows, reflecting walls and night operation matter. One noise figure in a brochure cannot answer that question. Ground or groundwater sources need separate assessment of technical feasibility and the required authority procedures. Prepare a site plan and photographs of possible locations. Ask for rejected alternatives and their reasons to be recorded. This preserves the reasoning behind the decision, including whether space, complexity, sound or another constraint ruled out a particular arrangement.
4. Include hot water, water circuits and controls
A heat pump works with storage, pumps, emitters and controls. Request an understandable system diagram, the proposed hot-water arrangement and the purpose of additional tanks. Identify special requirements, such as several showers used simultaneously, at the outset. Ask which occupancy assumptions apply and what the response to a fault will be. Agree who coordinates design decisions with the installer. You can already specify the records required at handover: a system diagram, control settings, operating instructions, contact details and a way to observe electricity use and heat output over matching periods.
5. Consider district heating and planned renovation
Review municipal heat planning and ask the relevant operator about the status of supply to your address. Kiel describes its plan as orientation; a coloured area on a map is not a binding connection offer. Compare a building-level option with district heating only when the network proposal is sufficiently defined, including timing and price components. If improvements to the building fabric are planned, consider the heating option and renovation sequence together. An urgent heating failure also requires discussion of a workable interim arrangement. Record which decisions are needed now and which can remain open until a specified review point.
6. Evaluate offers using the same assumptions
Request a comparison of installation scope, associated work, running costs and efficiency assumptions. Include maintenance, user instruction and any design tasks still outstanding. Calculated savings depend on occupancy and energy prices, so consider several plausible scenarios. Funding advice should check the specific programme, its application process and contract conditions before any start that would invalidate eligibility. Use the current programme documentation for that assessment. The advice stage should end with a reasoned option and explicit next tasks. Qualified installers handle installation and commissioning; subsequent checks should assess whether comfort and operation correspond to the assumptions used in planning.