1. Distinguish urgent defects from planned improvements
Start with an inventory: which elements are defective, which still work and which you want to improve for comfort or energy reasons. Record roof leaks, signs of moisture and equipment faults separately from long-term ambitions. Urgent problems need professional assessment and should not wait for an entire energy strategy to be completed. Gather drawings, repair records, energy bills and earlier investigations. Add opportunities such as an already planned roof or façade project. This makes it easier to identify work that should be prepared together and early decisions that could affect later options.
2. Define a shared objective for the building
Describe how the building will be used in future: by the same household, with additional living space or following a change of ownership. Prioritise comfortable rooms, lower energy demand, summer comfort and disruption during construction. An iSFP can explain how different energy improvements relate and support a decision. Also identify questions outside that assignment, such as a structural investigation or the design of an extension. Agree which missing information must be collected first. An objective with clearly recorded uncertainties is more useful than an apparently precise programme built on assumptions nobody has checked.
3. Plan how successive measures connect
Discuss the roof and a future PV array together, as well as windows and possible external insulation, and a more airtight envelope with its ventilation concept. Thermal bridges are areas where heat flows more readily through the construction; their details need particular attention. Dena stresses coordination between trades and properly executed connections in renovation. Ask for critical junctions to be sketched and responsibilities assigned. For each phase, establish whether the next measure can connect without avoidable removal of completed work. These questions belong before construction, while the related details can still be changed together.
4. Compare staged work with a coordinated renovation
Compare a staged route with a sensibly coordinated alternative. Both should use the same starting condition and comparable objectives. Ask about repeated site setup, necessary interim arrangements and additional design work. Separate repairs, energy improvements and other wishes in the budget without counting shared work twice. Include practical constraints: occupied rooms, access to the property and periods when temporary arrangements are possible. A realistic sequence considers both affordability and the disruption you can manage. Record the decision with its assumptions and quotation items that remain unresolved, rather than presenting an early estimate as a final project cost.
5. Include funding checks and appointments in the sequence
Identify the actual programme, applicant and required process for each potential source of support. Do not combine the rules for advice, individual building measures and heating replacement into one assumed procedure. KfW’s heating support, for example, specifies its own documents and contract conditions. Have the timing of each appointment checked, including any conditions required in contracts. A blanket assumption that every application can be submitted afterwards is an unreliable basis for proceeding. Keep the reviewed programme version, quotation status and responsible contacts together. A project change should trigger a review of the funding assumptions that it affects.
6. Plan quality checks and future revisions
Agree checks for work that will later be concealed or difficult to access. Ask which records, photographs and test reports belong to the selected scope, and who will resolve findings with the contractors. Construction monitoring needs a defined appointment; it does not automatically cover all specialist design. After each phase, bring together the records, work actually completed and remaining tasks. Before the next phase, check whether occupancy, budget or technology has changed. Updating the sequence prevents an earlier plan from being reused without examination when the conditions behind it have materially changed.
Sources and technical background
Sources as of 10 September 2026.