Choosing a renovation sequence

A suitable renovation sequence follows from the building’s condition, dependencies between measures, your objectives and available budget. There is no universal order for every house. An individual renovation roadmap, or iSFP, can coordinate measures; their execution and detailed design still need to be developed for the actual project.

Discuss your project

1. Distinguish urgent defects from planned improvements

Start with an inventory: which elements are defective, which still work and which you want to improve for comfort or energy reasons. Record roof leaks, signs of moisture and equipment faults separately from long-term ambitions. Urgent problems need professional assessment and should not wait for an entire energy strategy to be completed. Gather drawings, repair records, energy bills and earlier investigations. Add opportunities such as an already planned roof or façade project. This makes it easier to identify work that should be prepared together and early decisions that could affect later options.

2. Define a shared objective for the building

Describe how the building will be used in future: by the same household, with additional living space or following a change of ownership. Prioritise comfortable rooms, lower energy demand, summer comfort and disruption during construction. An iSFP can explain how different energy improvements relate and support a decision. Also identify questions outside that assignment, such as a structural investigation or the design of an extension. Agree which missing information must be collected first. An objective with clearly recorded uncertainties is more useful than an apparently precise programme built on assumptions nobody has checked.

3. Plan how successive measures connect

Discuss the roof and a future PV array together, as well as windows and possible external insulation, and a more airtight envelope with its ventilation concept. Thermal bridges are areas where heat flows more readily through the construction; their details need particular attention. Dena stresses coordination between trades and properly executed connections in renovation. Ask for critical junctions to be sketched and responsibilities assigned. For each phase, establish whether the next measure can connect without avoidable removal of completed work. These questions belong before construction, while the related details can still be changed together.

4. Compare staged work with a coordinated renovation

Compare a staged route with a sensibly coordinated alternative. Both should use the same starting condition and comparable objectives. Ask about repeated site setup, necessary interim arrangements and additional design work. Separate repairs, energy improvements and other wishes in the budget without counting shared work twice. Include practical constraints: occupied rooms, access to the property and periods when temporary arrangements are possible. A realistic sequence considers both affordability and the disruption you can manage. Record the decision with its assumptions and quotation items that remain unresolved, rather than presenting an early estimate as a final project cost.

5. Include funding checks and appointments in the sequence

Identify the actual programme, applicant and required process for each potential source of support. Do not combine the rules for advice, individual building measures and heating replacement into one assumed procedure. KfW’s heating support, for example, specifies its own documents and contract conditions. Have the timing of each appointment checked, including any conditions required in contracts. A blanket assumption that every application can be submitted afterwards is an unreliable basis for proceeding. Keep the reviewed programme version, quotation status and responsible contacts together. A project change should trigger a review of the funding assumptions that it affects.

6. Plan quality checks and future revisions

Agree checks for work that will later be concealed or difficult to access. Ask which records, photographs and test reports belong to the selected scope, and who will resolve findings with the contractors. Construction monitoring needs a defined appointment; it does not automatically cover all specialist design. After each phase, bring together the records, work actually completed and remaining tasks. Before the next phase, check whether occupancy, budget or technology has changed. Updating the sequence prevents an earlier plan from being reused without examination when the conditions behind it have materially changed.

Sources and technical background

Sources as of 10 September 2026.

Your home has potential

Let’s make the most of it.

Tell us about your building. Together, we’ll identify the next sensible step.

Enquire about your project
Good to know

Still have questions?

When is preparing an iSFP required?

An iSFP is required for the federal residential energy-advice subsidy. That programme condition should not be confused with a universal duty to prepare one for every home, or an obligation to implement every recommendation.

First establish what the stated requirement concerns: subsidised advice, another funding component or a legal requirement for the particular project. Dena and BAFA confirm the iSFP as part of subsidised residential advice. This is not an exhaustive review of every state-specific or building-specific duty. Ask which provision applies to your planned measure.

Direct link to this answer