Avoid three common renovation mistakes
Renovation involves decisions that must work together. Three common mistakes can be identified during preparation.
1. Commissioning separate measures without an overall plan
Windows, insulation and heating affect one another. Check the sequence and interfaces before placing individual orders. A renovation roadmap can organise coordinated measures; detailed design is commissioned separately when needed.
2. Comparing purchase prices alone
Compare quotations covering the same work. Connections, airtightness, moisture control, access and future maintenance matter too. A suitable construction depends on the building; generic material recommendations do not replace design.
3. Getting contracts and funding applications out of sequence
The sequence depends on the programme. For BEG individual measures and the KfW 458 heating grant, a supply or service contract generally has to be in place before the application is submitted, and it must be made conditional on the grant being approved (as a condition precedent or a condition subsequent). Work must not have started before the application; a contract signed without such a condition can jeopardise funding (position as of 28 August 2026). KfW 261 follows its own procedure; programme-specific exceptions need to be checked separately. Have the required contract and evidence clarified before you sign a binding contract. Funding is not guaranteed.
Examples of a sensible sequence
If the building envelope is insulated later, heat demand falls. A heating system sized for the old condition may then turn out too large. Consider envelope and building services together before fixing a heating output. Replacing windows also deserves a second look: tighter windows change the air exchange and can shift moisture problems to thermal bridges if junction details and ventilation are not planned at the same time. Junctions are particularly prone to errors: where roof, wall and windows meet, imprecise workmanship easily creates thermal bridges and air leakage. Clarify before commissioning who plans these interfaces and who inspects them afterwards. Which sequence suits your home can only be judged by examining the building itself.
How does the iSFP bonus work in funding?
An individual renovation roadmap (iSFP) funded under BAFA’s “Energy advice for residential buildings” programme can trigger a bonus for later BEG individual measures on the building envelope and building services (excluding heating) and raise the cap on eligible expenditure. Since 21 July 2026, however, the bonus has not applied across all costs: it is only granted above a minimum eligible investment volume, and the programme conditions at the time of application apply (position as of 28 August 2026). The iSFP bonus does not apply to heating replacement under KfW 458. Have the current conditions checked before you apply; our funding advice page explains the programmes and responsibilities.
Documents to have ready before you request quotations
Plans or sketches, the energy performance certificate (if available), consumption bills covering several years, photographs of the condition of building elements and earlier quotations or invoices help to describe measures and interfaces clearly. Missing documents do not automatically rule out advice; some details can be recorded on site or documented as assumptions. Also note which work has already been carried out and which problems you have noticed, such as cold walls, draughts or damp. The better the basis, the easier it is to compare quotations.